Mechanical Installation - Hach 9525sc DCCP System Manual Del Usuario

Ocultar thumbs Ver también para 9525sc DCCP System:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 114
Most panels are installed on a metal framing system or equivalent mounting structures. The
installation location must have the items that follow:
• Sufficient structural integrity in the floor and wall
• A sufficient anchor location
• A flat, vertical installation surface

3.2 Mechanical installation

Personal injury hazard. Instruments or components are heavy. Use assistance to install
or move.
Personal injury hazard. Lift the instrument by the stainless steel backplate. Do not lift the
instrument by the mounted components. The mounted components can break and
cause damage to the instrument and personal injury.
Personal injury hazard. Sharp edges can cause cut wounds. Wear personal protective
equipment to prevent injury.
Install the instrument on a wall. Refer to
3
wood studs with
/
-inch (M10) hardware.
8
Use sufficient supports to keep vibrations, gravity and thermal loads on the connections to a
minimum.
C A U T I O N
C A U T I O N
C A U T I O N
Figure
5. To install on drywall, attach the instrument to the
English 11

Publicidad

Tabla de contenido
loading

Tabla de contenido