4- Assembly and adjustments before operating
4.1- Assembly of the detached parts
The parts described below are delivered disassembled
to facilitate the machine transport. Assemble it according
next steps:
Feeding nozzle (1)
Install the feeding nozzle (1) according picture aside and
fasten it through pin (1a) and cotterpin (2b), which are
together with the detached items that follow the
machine.
Rotary discharge tube (2)
Install the discharge tube (2) on the nozzle (2a)
according picture below, fastening it with tree bolts (2b),
tree springs (2c) and six nuts (2d).
Note:
Observe the correct assemble position of the
elements by side.
Fasten the nuts (2d) to press the spring (2c),
so that it is possible to rotate the chute (2)
manually without doing a lot of effort.
10
2
1b
1b
1c
1d
2a
1
1a