4. ELECTRIC CONNECTION TO A DUAL SPEED ELECTRIC BOX
Basic valve is universal for any DUAL SPEED pump (1, 1.5, 2, 2.5 CV)
For a correct installation, you may need:
-
3-wire cable for the power supply
-
2-wire cable for the manoeuvre
-
2-wire cable for the electrovalve
Next steps on installation:
a) Connections on the multiport valve:
Repeat the steps on the a) section from the previous 3rd point (Connections on the multiport
valve).
b) Connections on the electric box:
1. Make sure power supply is off.
2. Remove the frontal cover to gain access to internal connections and components.
Fig. 12.- DUAL SPEED electric box
3. Insert through suitable glands power and manoeuvre cables that we have previously
connected on the BASIC valve.
15/12/2010
Página 10 de 19
Installation Manual
BASIC Automatic
Multiport Valve
Rev 3.0