Descargar Imprimir esta página

Astralpool System VRAC III Basic Manual Instalación página 18

Válvula selectora

Publicidad

Idiomas disponibles

Idiomas disponibles

8. Once the led has lighted on, stop unscrewing. After 10 seconds, the valve will start a
backwash routine.
9. Open the return to pool valve and check the green led lights off. Check the valve
completes the full cycle (backwash + rinse) and returns to filter position at the end.
10. Assemble again the rubber cap. Now the valve is ready to work.
Note: If there is a change on the installation that may cause different flow or pressure
conditions, the pressure switch may have to be tuned again.
15/12/2010
Fig. 26.- Pressure switch with rubber protection.
Página 18 de 19
Installation Manual
BASIC Automatic
Multiport Valve
Rev 3.0

Publicidad

loading