8. Electric connections have finished. Connect again the tape connector on the electronic
board of the valve and screw the 4 bolts of the cover.
9. Connect the power supply and check the valve goes to Filter position and the pump
starts working, increasing pressure inside the filter and flowing water through the pool
nozzles.
10. Check the pump works correctly, both automatic and manual position from the 3
position switch.
15/12/2010
Página 9 de 19
Installation Manual
BASIC Automatic
Multiport Valve
Rev 3.0