6. CHOOSE THE OPENING (INTERIOR BLOWER)
Remove the knockout for the chosen opening (horizontal at the back of the hood or vertical on rough-in
plate). See pictures below.
When using P5 blower, remove the 10'' wide knockout (smaller part). If using P8 blower, remove
the knockout corresponding to the ducting installed (10'' or 14'').
14''
KNOCKOUT
10''
KNOCKOUT
HD0076
Removing horizontal knockout opening on back of hood
7. INSTALL THE ROUGH-IN PLATE (INTERIOR & EXTERIOR BLOWER)
INTERIOR BLOWER: Secure the rough-in plate (provided with the P5 and P8 blower) inside the hood with
four (4) lock nuts. See picture below.
HD0042
EXTERIOR BLOWER: Purchase Model 332KR separately. Refer to instructions included with the rough-in
kit. Secure the rough-in plate inside the hood with (4) lock nuts.
8. INSTALL THE DEVIATOR (INTERIOR BLOWER)
YOU MUST install the deviator if you choose to vent the hood
vertically. Install the deviator as shown.
NOTE: If installed correctly, the deviator will protrude about 1/8"
above the rough-in plate.
CAUTION
HD0077
Removing vertical knockout opening on rough-in plate
HD0003
Inserting deviator into hood vertical opening
- 6 -