- regularly the presence of travel end stopper,
the presence of plates and safety instructions
(and their readability),
- safety of the suspension structure
- there is no accumulation of snow, ice, debris
or materials on the winch,
- that there are no obstructions on the façade or
in the shaft
- at the end of work, that the deactivation is
complete.
- If a charge is to be raised by multiple devices,
the installation of these must be preceded by a
technical review by a competent technician
and then conducted according to this study,
including to ensure the constant distribution
of the load in suitable conditions.
During the operations of lifting, up and
down, the user must constantly observe the load and
the free end of the cable to prevent any risk of
collision. The load must be constantly guided
(EN14492-2); otherwise the use of rotation-resistant
wire rope is necessary.
Check and apply local regulations concerning
the installation, use, maintenance and control of
lifting devices.
See also contraindications §2.6
1.7

Anchoring

Verify that the anchoring point is strong enough for
the effort to apply.
If the anchoring is not provided by FIXATOR each
anchor must withstand, without any deformation, up
to 2.5 times the WLL of the winch and remain
stable when subjected to this load.
That is :
461E / LM300S+
750kg (1650lbs)
461D / LM450+
1125kg (2500lbs)
461C / LM500+
1250kg (2750lbs)
(special case of reeving 2:1, the resistance must be
of 5 times the WLL. For example, 2500kg for
LM500+; see §2.1.4)
Minimal withstanding of the hoist and/or pulley
anchorage:
INSTRUCTION MANUAL
Electrical winches LM+
If the fixing of the unit must be in a dangerous place
for the operator, the safety precautions provided for
by the work's regulation must be taken to exclude
any risk uncontrolled in this operation. It is perhaps
better in this case to implement the hoisting cable
into the device before the anchoring operation.

2 Installation and Use

2.1
Les opérations d'installation et d'utilisation doivent
Installation and use operations must be performed
by personnel specially trained by the manufacturer
or its dealers, duly authorised by their employer.
Depending on your country, regulatory inspections
may be necessary.
Make sure you have:
-
mm
-
suitable number of wires with suitable cable
section,
-
pulley are different according your installation;
check your case with a qualified technician:
Instructions for installation, assembly,
commissioning and use - training
a sufficient length of special cable Ø6.5-6.8
an adequate length of supply cable and
Accessories you may wish to use
The reaction in the anchorage of hoist and/or
Réf : 1813000204
Page : 5/20
Version : 46/18

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Lm300sLm450Lm500461e461d461c

Tabla de contenido