Installation; Assembly - SOMFY Tilt&Lift 25 RTS Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 41
Tilt & Li 25 RTS

2. INSTALLATION

Attention
• These instructions are mandatory for motorisation and
automation professional installing the drive.
• Never drop, knock, drill or submerge the motor.
• Install an individual control point for each motor.

2.1. ASSEMBLY

2.1.1. Drive preparation
1) Cut the sha to the length required.
2) Position the headrail and sha adapters on the
motor
2.1.2. Motor integration inside the headrail
1) Insert the motor in the headrail.
Attention
Take care not to cut the power supply
wires on the edges of the headrail when
introducing the motor.
2) Let the sha abut against the motor sha
adapters.
For optimal radio reception, the antenna should
be kept straight and outside the headrail.
Copyright
2018 SOMFY ACTIVITES SA, Société Anonyme All rights reserved.
©
1
2
1
2
EN
17

Publicidad

Tabla de contenido
loading

Tabla de contenido