Mitsubishi Electric CITY MULTI PURY-P-TNU-A Serie Manual De Instalación página 42

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

10-5-2. Fixing the cables in place
Route the cables as shown in the figures below.
・(E)P72 YNU
Main Box
Transmission terminal block
Rubber bushing
(for main inverter connection
wiring (200 V) and unit wiring
(solenoid coil wiring))
Tie band
(Supplied)
Rubber bushing 2
Unit wiring (sensor wiring)
・(E)P72 TNU
Main Box
Transmission terminal block
Rubber bushing
(for Fan cable and unit wiring
(solenoid coil wiring))
Tie band
(Supplied)
Rubber bushing 2
Unit wiring (sensor wiring)
WT09106X03
Main inverter
connection wiring
(low voltage)
Fill the gap.
Main inverter
connection wiring
(low voltage)
Fill the gap.
GB-40
Inverter Box
Power supply terminal block
Cable strap
Rubber bushing
(for FAN cable)
Tie band
(Supplied)
Rubber bushing 1
Power cable
(not supplied)
Transmission cable (not supplied)
The length of the section after the cable
access hole must be at least 1100 mm (43 in).
Inverter Box
Power supply terminal block
Cable strap
Rubber bushing
(for FAN cable)
Tie band
(Supplied)
Rubber bushing 1
Power cable
(not supplied)
Transmission cable
(not supplied)

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

City multi pury-p-tnu-a-bs serieCity multi pury-ep-tnu-a serieCity multi pury-ep-tnu-a-bs serieCity multi pury-p-ynu-a serieCity multi pury-p-ynu-a-bs serieCity multi pury-ep-ynu-a serie ... Mostrar todo

Tabla de contenido