USER'S MANUAL. PE-425
3.4 Analysing Electrical Network and the Fault
Connecting the meter:
After connecting the test leads to the circuit under test and before starting the reading,
verify on the instrument that the connections are correct checking that red LED N-E is
unlit and green indicators LEDs L-N, and L-E are lit.
Starting screen
Connect test leads
Press
ON/TEST
Tester connected?
YES
Automatic test starting
Voltage between Line-Neutral
Disconnect test leads
Press ON/TEST
YES
Tester disconnected?
NO
AC voltage between Line-Earth
1
NOTE:
If you desire to visualise the results of a previous test, do not connect the test
leads to the circuit under test.
05/2015
1
"Without connecting" message
NO
Previous measurement exist?
Recovering previous measurements
Voltage between Line-Neutral
Press ON/TEST
Press ON/TEST
YES
Press ON/TEST
NO
Page 11