Sime Murelle EV HE 25/55 Manual De Instrucciones página 91

Ocultar thumbs Ver también para Murelle EV HE 25/55:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.4
DISASSEMBLING THE SHELL
To simplify maintenance operations on the
boiler, it is also possible to completely remo-
ve the shell, as shown in Figure 19. Turn the
control panel to move it forward and be
able to access the internal components of
the boiler.
4.5
MAINTENANCE
To guarantee functioning and efficiency of
the appliance, in respect of the legal provi-
sions in force, it must be regularly checked;
the frequency of the checks depends on
the type of appliance and the installation
and usage conditions.
In any case, it should be inspected at least
once a year by a qualified technician.
During maintenance operations, it is
important to verify that the drip-plate
with drain trap contains water (this
check is particularly important if the
generator has not been used for exten-
ded periods of time).
ATTENTION
Before removing or refitting the front
panel of the boiler, open the small
upper plastic door.
Codice/Code 8102740
Modello/Model MURELLE EV HE 25/55
Matricola/Serial n. 9999999999
PAR 1 = 20 (G20) / 22 (G31)
PAR 2 = 3
If necessary, the drip plate can be filled
using the tap provided (Fig. 20).
4.5. 1
Chimney sweep function (fig. 21)
To check boiler combustion, press the
installer's key
for a few seconds. The
chimney sweep function will switch on and
will continue for 15 minutes.
From that moment, the boiler will start
working in heating mode at maximum
power, with cut off at 80°C and re-ignition
ES
PT
ENG
Fig. 19
91

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Murelle ev he 30/55Murelle he 25/55 erpMurelle he 30/55 erp

Tabla de contenido