2 OTHER TILED HORIZONTAL SURFACES
Installing fibers in surfaces clad with ceramics and other hard materials requires similar steps to those detailed on the
pool installation:
1. Illuminator location
2. Deployment of fiber to the installation zone
3. Preparation of the surface and preparation/distribution of the fibers.
4. Preparation of ceramic or natural-stone tiles
5. Tiling
6. Grouting, cleaning and finishing
In the following pages there are instructions for the installation of fibers in drills or housings in ceramic tiles or natural-
stone slabs (Fig 1) or in the joints between them (Fig 2).
2 OTROS PARAMENTOS HORIZONTALES SOLADOS O ALICATADOS
La instalación en paramentos forrados de materiales rígidos consta de etapas similares a las detalladas en la sección
de piscinas:
1. Ubicación del iluminador
2. Tendido de las fibras hasta la zona de uso
3. Adecuación de la superficie y distribución/preparación de las fibras
4. Preparación de las piezas cerámicas o baldosas
5. Solado o alicatado
6. Rejuntado, limpieza y acabado
En las páginas siguientes se detalla la instalación de fibras en alojamientos practicados en las piezas cerámicas o
piedras naturales
(Fig 1) y en las juntas entre éstas (Fig 2).