Facom Y.135F Guía De Instrucciones página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 34
Basic Tool Operation
Before operating the tool check the following:
Inspect tool for damage or leaking oil – do not use tool if it is damaged or leaking oil.
Check that correct nosepiece is fitted and tightened to 60 - 65 in-lbs [6.8 – 7.3 N.m] torque.
Check that the nose housing nut 10 is tight – hand tighten only.
Connect tool to air supply – see air supply requirements (fig.A).
Fit Mandrel Collector 11 .
Open air supply valve by sliding VA on side of tool
(see note below).
Insert rivet into nosepiece.
Position rivet in work piece.
Pull trigger to set rivet.
Release trigger
! Note: The Y.135F has an VA (Open-Shut) valve for switching the air supply ON and OFF to save air when the tool is not in use.
Air Supply ON: Open valve
by sliding VA in the
direction shown (up).
VA
FRONT END SERVICE
!! Note: UNPLUG AIR SUPPLY while servicing front-end to avoid INJURY.
NOSE HOUSING NUT
10
NOSE HOUSING
WRENCH FLAT
JAW GUIDE LOCK MOTION
O-RING
PULLING HEAD LOCKING TEETH
JAW GUIDE TEETH
For optimum tool performance, Front-End maintenance should be performed regularly as per the "Preventative Maintenance Schedule".
Dry air
fi g.A
Air Supply OFF: Close Valve
by sliding VA in the
direction shown (down).
JAW GUIDE
PULLING HEAD
JAW GUIDE LOCK
HOUSING ADAPTER
11
12

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

830717

Tabla de contenido