Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23

4. Installation

The battery supplied with the TMJG 100D digital
pressure gauge must be installed by the user.
Open the pressure gauge by turning the display
ring beyond the limit stop. Open the battery
compartment and install the battery as shown.
Observe the polarity when fitting the battery.
Screw the G 1/4 male port of TMJG 100D into the
female pressure port of the pump or nut. Use the
lower hexagon to tighten the gauge. Loosen the
upper hexagon and rotate the TMJG 100D to the
desired position. Retighten the upper hexagon.
The face of TMJG 100D can be rotated through
355°. This feature allows the TMJG 100D to be
mounted in all possible positions: vertical,
horizontal or upside down. If the face is rotated
more than 355°, the face will detach from the
gauge.
6
SKF TMJG 100D

Publicidad

Tabla de contenido
loading

Tabla de contenido