Descargar Imprimir esta página

Agilent Technologies Medalist i1000 Manual Del Operador página 10

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 95
Running a Board Test
You can begin testing when the test program is loaded and the test status
shows Ready.
Abbildung 3 Medalist i1000 software
8
Wear an anti-static wrist strap at all times when handling PC
C A U T I O N
boards which are susceptible to damage by electrostatic
discharge. A connector for the wrist strap is provided on the
control panel or control box of the testhead.
Installation of the fixture and loading of the test program should be
N O T E
handled by qualified engineers only.
Medalist i1000 Operator Guide

Publicidad

Capítulos

loading