Installation Examples - WIKA TR33 Manual De Instrucciones

Ocultar thumbs Ver también para TR33:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Commissioning, operation
the equipotential bonding system, provided that it has a fixed and secure
contact to the metallic vessel, its components or pipes, and that these
are connected to the equipotential bonding system.
When there is a non-metal contact with the vessel, or with its
structural components or piping, the instrument must be provided with
equipotential bonding.
WARNING!
Neither repairs nor structural modifications are permitted, and
any would void the guarantee.
Installation examples
Insertion length A
For information on tapped holes, refer to DIN 3852 or for NPT threads to
ANSI B 1.20.
WIKA operating instructions model TR33
Installation on pipes
a on elbows
b in smaller pipe, inclined
c perpendicular to flow direction
EN
13

Publicidad

Tabla de contenido
loading

Tabla de contenido