Configuration; Piping And Duct Connections; Air Duct Connection; Connecting The Water Battery Piping - S&P CADT-D HE Manual De Instalación. Instrucciones De Uso

Recuperadores de calor de elevado desempeño
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1

6.3. CONFIGURATION

6.4. PIPING AND DUCT CONNECTIONS

6.4.1. AIR DUCT CONNECTION

The configuration displays in blue the route of fresh air blown into the premises,
while the used air and its route until it is expelled from the premised is in red. The
fans are always blowing out with regard to the machine.

6.4.2. CONNECTING THE WATER BATTERY PIPING

When using post-heating water batteries, it is important to take into account the
type of device installed, hence:
For CADT-D HE models, the water battery installation is known as remote, since
the water battery is positioned outside of the device, in any part of the duct desired
by the user, on the side of air impulsion to the interior, as can be seen in the fol-
lowing image.
The user or installer should only install the water battery at the most appropriate
duct point, in order to then connect the input and output tubes of the water battery
(half an inch for models 05, 08 and 18, and one inch for models 30, 45 and 56) to
the hot water closed circuit.
For CADT-DI HE models, the reference is changed for CADT-DC HE and the
installation of the water batteries is known as direct, since the water battery is set
inside the device at factory.
WATER BATTERY
12
REMOTE INSTALLATION

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cadt-di heCadt-dc he

Tabla de contenido