Prepare The Site - Kohler K-100 Guía De Instalación Y Cuidado

Bañera de hierro fundido esmaltado
Ocultar thumbs Ver también para K-100:
Tabla de contenido

Publicidad

1.

Prepare the Site

Position the rough plumbing.
Positionner la plomberie de
raccordement.
Coloque las tuberías de plomería.
Verify that the subfloor offers adequate support, and is flat and level.
Vérifier que le sous-plancher offre un support adéquat et qu'il soit plat et nivelé.
Verifique que el subpiso proporcione suficiente soporte y que esté plano y nivelado.
NOTE: This bath can be used with a wall-mount faucet or freestanding faucet. Refer
to the installation instructions packed with the faucet for proper placement of the
faucet and bath.
Flooring
NOTICE: Adequate floor support must be provided. Consult the rough-in guide
packed with the bath for specific floor loading requirements.
Install adequate floor support.
NOTICE: To ensure a successful installation, it is critical that the bath be installed on
a level subfloor.
Verify the subfloor is level. Adjust for level, if necessary.
Apply water-resistant sealant to the subfloor. This will reduce the risk of water
damage.
Framing – For Wall-Mount Faucet Installations
NOTICE: Take into account the thickness of the finished wall materials when
constructing the framing. If these factors are not taken into account, the bath will not
fit in the installation area.
Construct the framing with 2x4 or 2x6 studs according to the rough-in guide
packed with the bath.
Plumbing
Position the plumbing according to the rough-in guide packed with the bath.
Cap the supplies and check for leaks.
Finished Flooring
Apply the finished flooring material prior to installing the bath.
Ensure the finished floor is level before proceeding with the bath installation.
Kohler Co.
For Wall-Mount Faucet Installations
Pour des installations de robinet à montage mural
Para instalaciones de grifería de montaje a la pared
5
1084218-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido