Tools And Materials; Before You Begin - Kohler K-108 Guia De Instalacion

Ocultar thumbs Ver también para K-108:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.

Tools and Materials

Pipe
Adjustable
Wrench
Wrench
Thread
Sealant

Before You Begin

Observe all local plumbing and building codes.
Shut off the main water supply.
Carefully inspect the waste and supply tubing for any sign of
damage.
Replace waste or supply tubing if necessary.
For new installations, install the faucet before installing the
lavatory.
Kohler Co. reserves the right to make revisions in the design of
faucets without notice, as specified in the Price Book.
1010441-2-B
Hacksaw or
Tube Cutter
Channel Lock
Pipe Sealant
Pliers
2
Plumbers
Putty
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido