Establishing The Electrical Connection En - Binzel BRS-FP Instructivo De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

BRS-FP
6.2 Establishing the electrical connection
 Fig. 4 on page EN-11
Loosen the lateral mounting screws to remove the covering hood (7). You
can then access the PCB (1).
Guide the connecting cable through the PG 9 screws to the PCB.
Apply operating voltage of 24 V DC to X1.1 and X1.2.
Apply the control signal input for "START" to X1.3 or X1.4, depending on the electrical design of the robot
output.
Apply the control signal output for "READY" to X1.5 or X1.6, depending on the electrical design of the robot
output.
NOTICE
The torch cleaning station must be and remain without compressed air and power during setup!
• The gas nozzle diameter must match that of the set of clamping jaws.
• The distance sleeve must match the nominal diameter of the gas nozzle.
• The reamer must be precisely aligned with the torch type.
Fig. 6
Start
Device layout and terminal assignment
6 Putting into operation
Operator side
Ground to XPE 1
Clamping
Top view
PCB
831.0405
EN - 13

Publicidad

Tabla de contenido
loading

Tabla de contenido