1.5__MATERIAL REQUIRED FOR INSTALLATION
2___INSTALLATION
Disconnect the power supply before system installation or maintenance.
Make sure that the power supply voltage coincides with that which is indicated on the plate on the measuring
instrument.
Failure to comply with one of the requirements contained herein may cause damage to persons or property or
cause improper functioning and damage to parts.
INSTALL AS FOLLOWS:
-
Position the panel to the wall at an easily accessible height from the ground, with respect to both the upper and
lower part of the panel.
Note: The panel must be level and possibly leaded. Free up the flooring to make easy access to the panel.
-
-
Connect the water inlet to an outlet that ensures an uninterrupted flow of water between 40 and 60 l/h at a
pressure equal to +0.5 bar output pressure; this pressure should not exceed 6 bar.
-
The flow rate must remain constant; any change can cause an error in measurements equal to 1.5%/Δ l/h.
-
If in the event of a lack of feed, the delivery hose can be emptied, it is advisable to add a check valve at the
inlet. This prevents the emptying of the electrode holder tanks by siphonage, a situation that damages the pH
measurement electrode.
-
Connect the output to a recovery point of the water with a back-pressure of maximum 5 bar.

TANK INSTALLATION

Do not place the bins containing chemicals in the system as emitted fumes cause deterioration of equipment. The
recommended distance is a MINIMUM of 2 metres.
NOTES: See the measurement system INSTALLER INSTRUCTIONS MANUAL regarding probe calibration
and the connection of the dosing pumps and their use.
CONTROLLER PANEL PRC
Code 0000137737
rev. 2.1