Complete The Installation - Kohler K-6299 Guía De Instalación Y Cuidado

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Backing
Adhesive
Locking Tape

10. Complete the Installation

Check for Leaks
Turn on the main water supply.
Turn on the tank water supply.
If applicable, turn on the bidet seat water supply.
Check for leaks.
Confirm Correct Operation
Press the left side of the faceplate to confirm the full flush is
operating correctly.
Press the right side of the faceplate to confirm the eco-flush is
working correctly.
If applicable, confirm the bidet seat is functioning correctly
following the instructions provided with the seat.
Install the Side Panels
NOTE: There is a left and right side panel. They are not
interchangeable.
Kohler Co.
Adhesive
Locking Tape
13
1145594-2-B

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-6300

Tabla de contenido