Kohler Sterling 572111 Guía De Instalación Y Cuidado página 3

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Ledge
Ledge
Ledge
1. Install the Wall Jamb
IMPORTANT! Install the wall jamb on the same side wall as the showerhead.
Position the wall jamb against the wall, on the highest point on the bath or shower base ledge. Refer
to the illustration above for correct placement.
Using a level, ensure the wall jamb is plumb.
Temporarily secure the wall jamb with masking tape.
Make a pencil mark at each of the three hole locations in the wall jamb.
Remove the masking tape and move the wall jamb to a safe area.
IMPORTANT! The supplied 6 mm drill bit is not suitable for drilling through tile. For tile installations,
use a 6 mm tile bit.
Slowly drill a 6 mm hole at each of the three marked hole locations, using the provided 6 mm drill
bit for non-tiled walls.
Insert an anchor in each hole. Make sure the anchors are flush with the finished wall.
Secure the wall jamb in place using three provided #8 x 1-1/2" screws.
Apply silicone sealant to the bottom inside of the wall jamb.
Sterling
Wall Jamb
Wall Jamb
Wall Jamb
3
6 mm
1280804-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido