3. Secure the Top of the Screen
Push the top of the screen into the wall jamb.
NOTE: Have a partner hold the door or shim the front edge of the door for this step.
While supporting the panel, drill the top two 3 mm holes through the wall jamb channel and into
the screen frame.
Secure the top of the bath screen frame to the wall jamb using the remaining screws.
Sterling
5
Wall Jamb
Channel
1280804-2-B