To achieve electrical supervision:
1.
Ensure that power is off.
2.
Remove the threaded dome assembly by twisting it
counterclockwise.
3.
Connect one red (+) lead to the positive side of the incoming
power source
4.
Connect the other red (+) lead to the positive side of the
outgoing power source.
5.
Connect one black (–) lead to the negative side of the
incoming power source
6.
Connect the other black (–) lead to the negative side of the
outgoing power source.
7.
If required, the green screw in the housing is provided for
connection to an earth ground. To gain access to the screw,
remove the power supply assembly.
8.
Secure the dome to the base of the beacon.
9.
Test the beacon for proper operation.
Safety Message to Maintenance Personnel
Listed below are some important safety instructions and
precautions you should follow:
• Read and understand all instructions before operating this system.
• Any maintenance to the light system must be done with power
turned off.
• Any maintenance to the light system must be performed
by a trained electrician who is thoroughly familiar with all
applicable national and local codes in the country of use.
Installation and Maintenance Instructions
Models 154XST and 154XST-S
13