Descargar Imprimir esta página

Allegion Schlage L9000 Instrucciones De Instalación página 2

Publicidad

3
Install springs and spindles.
4
Prepare outside lever assembly for installation.
4a
Install outside mounting posts.
LV functions
4b
Install outside spring cage or spacer.
L The spring cage arrow
must point in direction
of lever down rotation.
5
Install outside lever.
Exterior
2
FULLY
TIGHTEN
MOUNTING
POSTS
ON SCREWS.
OR
Install spacer
for L/LV9485
6
Install inside spring cage and mounting plate.
L The spring cage arrow
must point in direction
of lever down rotation.
7
Install inside lever and rose.
8
Tighten bushing with spanner wrench.
9
Prepare the indicator side of the door.
Use template to mark and drill four (4) pilot holes.
Required for indicator side of door ONLY!
a.
Template
Interior
b.
Use level to align
template with door edge.

Publicidad

loading

Este manual también es adecuado para:

Schlage lv9000