Descargar Imprimir esta página

Allegion Schlage L9000 Instrucciones De Instalación página 5

Publicidad

Coin Turn Functions with Indicator
11a Unlock the door.
11b Install the indicator assembly.
DO NOT use power screwdriver.
DO NOT overtighten.
11c Install the indicator faceplate. Secure the faceplate with
two set screws.
Exterior
Use small screwdriver.
Indicator
faceplate
STEP 12 for NON-INDICATOR INSIDE TRIM ONLY.
For INDICATOR TRIM, skip to STEP 13.
12
Install inside cylinder or thumb turn.
Cylinder Functions
12a Insert key halfway into the cylinder, and install the
cylinder with ring and cylinder spring as shown.
Key inserted
halfway
12b Rotate cylinder clockwise.
Thumb Turn Functions
12a Use template to mark and drill two (2) pilot holes.
Interior
12b Install the thumb turn.
If both inside and outside of lock are now installed, skip to step 14.
Interior
Use level to
align template
with door edge.
Rotate
90°
5

Publicidad

loading

Este manual también es adecuado para:

Schlage lv9000