Main Switch - Erreka BUL Guía Rápida De Instalación Y Programación

Ocultar thumbs Ver también para BUL:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
FT
GND
SNG1
V+
A1
Operator 1
A2
Operator 2
G1/G4 Red cable (motor)
G2/G5 Blue cable (motor)
V+
Brown cable (encoder supply)
GND
Mesh (encoder mass)
SNG1 Green cable (encoder signal 1)
SW1

Main switch

• Select the number of operators using C0 (C001: one operator, C002: two operators).
• Programme C7 for operation with encoder (C701).
• For the BUL operator, programme C301.
Turning direction check: after connecting the power and activating any of the key devices, the
gate makes a reset (the display showsrS): the gate closes until it reaches the stopper, assigning this
stopper with the position "gate closed" If it opens instead of closes during reset, change the turning
direction (C101 or C102 for A1 and C201 or C202 for A2).
12
Electrical connections VIVO-D201(M)
F3
P24 P25
ENCODER1
ENCODER2
-FT
AUX
(Test)
24 Vdc
P13 P14 P15 P16 P17 P18 P19 P20
P21 P22 P23
P1 P2 P3
P4 P5 P6
P7 P8
P9 P10
P11 P12
CN22
+24Vdc
SW1
MOTOR2
G4 G5
G6
MOTOR1
G7 G8
G9 G10
G1 G2 G3
F2
CHG
LB/ LR
F1
VIVO-D201:
VIVO-D201M:
N
L
POWER
VIVO-D201:
VIVO-D201M:
VIVO-D201:
230Vac, max 2.300W
VIVO-D201M:
125Vac, max 1.250W
P187Z

Publicidad

Tabla de contenido
loading

Tabla de contenido