EN
5.2 Prepare main assembly for installation
See the corresponding illustrations in manual B.
B
5.2
1. Prepare main assembly for cable installation.
a. Choose the suitable routing method for the supply cables.
b. If using on-wall wiring, remove one of the four break-out tabs using a set of pliers.
Caution
Leaving sharp edges after removing the break-out tabs can cause damage to the cables
and result in a risk of electric shock.
▶ Make sure that no sharp edges are left after removing the break-out tabs.
NOTE: It is recommended to remove the bottom break-out tab and route the
supply cable through the bottom tab (if applicable).
c. Optionally, remove knockouts.
Warning
Removing more knockouts and/or blind plugs than necessary for cable routing and leav-
ing open holes will affect the protection against moisture of the wallbox, which can result
in the risk of electric shock.
▶ Only remove the knockouts necessary for cable routing.
▶ Seal open holes with blind plugs if they are not necessary for cable routing.
I.
II. Place a wide-head screwdriver (for example T30) into the slot of the knockout
III. Hit the end of the screwdriver with a hammer to shear the knockout. Remove
30
Place the wallbox on a smooth flat surface.
that is to be removed.
the rest of the knockout by hand if necessary and make sure that there are no
burrs present.
NOTE: If the holes needed for cable routing are already sealed with blind plugs,
remove these blind plugs using a pair of pliers.