7. Optionally, install and connect the Ethernet cable.
a. Strip the outer insulation of the cable, then strip and crimp the individual wires to a
suitable length for the Ethernet connector.
b. Mount the Ethernet connector.
c. Connect Ethernet cable to the communication board.
8. Mount front cover:
a. Connect the HMI cable to the HMI board.
b. Connect the RFID cable to the HMI board.*
c. While holding the front cover next to the main assembly, connect the HMI cable to
the power board.
d. While holding the front cover next to the main assembly, connect the RFID cable to
the communication board.*
e. Before closing the wallbox, check and ensure the following:
I.
All cables are connected properly.
II. The communication board is in the correct position. Check by pressing on it
gently.*
III. The charging cable holder is aligned with the edges of the main enclosure.
IV. The rubber seal of the charging cable and the rubber seal of the front cover are
in the correct position, clean and not damaged.
V. There is no risk for the cables to be trapped between main assembly and front
assembly.
f.
Place the front cover onto the main assembly by using the provided hooks of the
front cover. Mount the front cover by tightening the six screws M4 x 10 mm.
9. Align the bezel with the UP arrow on the inside pointing up. Push the bezel onto
the front cover so it locks in position.
10. Wind the charging cable around the wallbox for proper storage.
11. Turn on the input power of the station.
The wallbox state LED comes on to show that the wallbox is starting up to become ready to
charge. See chapter Status indication for more information.
* For ŠKODA iV Charger Connect and ŠKODA iV Charger Connect+ only.
EN
35