Skoda iV Charger Manual De Instrucciones página 31

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
a. Place the charging cable holder on the main assembly with the V-shaped side
towards the main assembly.
b. Connect the PE wire of the charging cable to the second available slot of the PE
feed-through terminal.
c. Connect the CP wire of the charging cable to the CP feed-through terminal, located
at the end of the DIN-rail.
d. Route Neutral (N), L1 (as well as L2 and L3 - for 3-phase version) wire(s) of the
charging cable through the ELS sensor. Connect them directly to the terminals on
the power board according to the table below.
Color coding for EV charging cable
Wires
Color
4. Set the DIP-switches.
Caution
A damaged communication board may result in improper installation and thus cause un-
stable wallbox functionality.
▶ Be careful not to damage the communication board during DIP-switches
configuration.
See chapter Set DIP-switches for the DIP-switch settings required.
5. Remove cardboard cover.
6. Optionally, connect the RS485 cable.
a. Insert the three wires into the kWh meter following the color coding below.
Color coding for RS485 cable
Wires
Color
kWh meter connection
b. Push the cable's connector into the dedicated port on the communication board.
34
L1
L2
Brown
Black
N
White
37 / A
L3
N
Grey
Blue
P
Red
36 / B
PE
Green /
Yellow
PE
Black
35 / C

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Iv charger connect

Tabla de contenido