Husky 32220 Instrucciones De Instalación página 4

Ocultar thumbs Ver también para 32220:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Prior to assembly of "HUSKY ROLLER", be sure that your base rails are properly installed and
square with each other. Measure diagonally across the rails. See Figure 1. Measurements "X" &
"Y" should be within 3/16" of each other. These measurements are required for proper fit and
function of the "HUSKY ROLLER". If using pre-existing base rails ensure that the center to center
(fore and aft) distance is 22" and that there are two pairs of slots in the base rails that are 20-5/8""
apart (side to side) Otherwise contact your local dealer for proper base rail selection and
installation.
Figure 1
Base Rails Not
Included.
2. Install the Husky Center Bolt kit 32059, which is REQUIRED. Purchased separately.
3. Locate the center hole in each base rail. See Figure 1. Using these holes as a guide, drill a 5/8"
hole through the truck bed. Confirm that the fuel tank, brake/fuel lines, electrical wires located
under the bed are not in the path of drilling the holes in this step.
4. Drop the 5/8 carriage bolts supplied through the center bolt locations, through the truck bed.
5. Check the corrugations in the truck bed floor and place the spacer plate in the correct position as
shown. See Figure 2.
All Products limited to Vehicle Tow Rating; see Vehicle Owners Manual. See
for Warranty Information / Tech Support ©2014 Husky Towing Products Revision: June 03, 2014-REV 4
CENTER BOLT INSTALLATION
X
Y
20-5/8"
29"
Page 4 of 42
Center Bolt
Hole Locations
www.huskytow.com

Publicidad

Tabla de contenido
loading

Tabla de contenido