Emerson Micro Motion DS025 Instrucciones De Instalación página 9

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 77
Figure 4.
DL065, DL100, and DL200 sensors
Purge connection
(optional)
Approvals tag
Flow direction arrow
Process connection
STEP 1.
Determining a location
The sensor may be located anywhere in the process line, as long as the
following conditions are met:
Before operation, you must be able to stop flow through the sensor.
(During the zeroing procedure, flow must be stopped completely, and
the sensor must be full of process fluid.)
During operation, the sensor must remain full of process fluid.
The sensor must be installed in an area that is compatible with the
classification specified on the sensor approvals tag (see Figures 1- 4).
Choose a location for the sensor based on the requirements described in
this section.
Ground screw
Sensor housing
Calibration tag
Purge connection
(optional)
Process connection
Junction box
5

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido