Testing The Diaphragm Switch - Little Giant 5 Serie Manual Del Propieratio

Ocultar thumbs Ver también para 5 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
OPERATION
Testing Automatic Pump Operation

Testing the Diaphragm Switch

NOTE: This test is recommended for bench testing only.
1. Squeeze the bulb of a suction bulb syringe to create suction.
2. Insert the small end of the syringe into the breather tube of the power cord
or stripped end of the power cord.
3. Release the bulb to induce suction/vacuum.
4. Listen for the switch to make a click sound.
5. Once the suction/vacuum equalizes, listen for the diaphragm switch to
release.
The suction causes the switch diaphragm to draw inward, activating the switch inside the switch hous-
ing. When syringe is released, the diaphragm returns to its original position deactivating the switch
inside the switch housing.
8

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido