Frontier BG1000 Manual Del Operador página 30

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY
UPON ARRIVAL . . . .
Packing List
1
BG1000 Grinder
2
5NT20028 Rails
1
Carriage Assembly
1
Parts Box
Site Requirements
Indoors
Dry
Reasonably level - cement floor
Good Lighting
115 Volts, 50/60 Hertz, 15 Amp outlet
Adequate access to the front of the machine for the operator.
Move the machine to the site, then proceed with assembly.
The BG1000 is shipped on a pallet, assembled, except for the rails, carriage, and a few small
attachments.
1. Remove from pallet and set on floor.
2. Remove the rails from the paper tubes and install in the mounting brackets. Rail extension
from the brackets to the end of the rails is 24" [61 cm] the left and 13" [33 cm] to the right.
3. Install the ring stops, one on each end of the rails to prevent the carriage from rolling off
the ends of the rails.
4. Remove the carriage from the base and set on top of the rails.
5. Install the center bedknife support from the parts box.
6. Install the bedknife "hold down" from the parts box.
ASSEMBLY
THE MAIN BASE ASSEMBLY WEIGHS 250 LBS (122 KG).
TO LIFT, USE POWER EQUIPMENT OR GET ADEQUATE HELP.
8

Publicidad

Tabla de contenido
loading

Tabla de contenido