Heating Priority Wiring For Three Phases Pump - Hayward SumHeat FULL INVERTER Manual De Instalación E Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 96
6. APPENDIX (continued)

6.3 Heating priority wiring for three phases pump

Remove the front panel to access the terminal board.
L1
L2
1L1 3L2 5L3
2T1 4T2
Terminals 1 and 2 deliver a potential-free dry contact,
230V
/ 50 Hz, no polarity.
Wire terminals 1 and 2 as indicated in the diagram
above, to activate the operation of the filtration pump
in 2-minute cycles each hour if the temperature of the
pool is lower than the set point.
Never connect the power supply of the filtration
pump directly to terminals 1 and 2.
30
L3
N
13N0
A1
6T3
14N0
A2
L3
L2
L1
Three phases pump
4
5
6
7
1
2
3
8
=
=
S
R
Power supply
430V 3N
Dry contact
7 A max
K2
=
= =
=
T N
1
2
/ 50Hz
= =
3 4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Issuminvr32

Tabla de contenido