ABB 6931U-101-500 Manual De Instrucciones página 34

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 59
Start-up
Operation of the device is software-dependent.
To program, connect a PC with an ETS of 2 V 1.1 or higher
or Power Project (min. Vers. 3.0) to the Powernet EIB bus
line via the EIB-RS 232 interface.
Allocation of the Physical Address
• Switch on the supply voltage.
• Press the programming button (Fig. 1, pos. 8) on the
device: The red programming LED (Fig. 1, pos. 9)
illuminates.
• The red LED extinguishes after the physical address has
been programmed.
• Note the number of the physical address on the device
(Fig. 1, pos. 3), if appropriate, using a non-smudge pen.
Selection/Parameterisation of the Application
Please refer to the current Technical Manual for a description
of the available applications/versions and appurtenant
parameters.
GB

Publicidad

Tabla de contenido
loading

Tabla de contenido