Grounding The Generator; Using Generator For Backup Power - Honeywell HW7000EH Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Grounding the Generator

WARNING
Generator must be grounded to prevent electrical
shock from faulty appliances.
• Before using generator, consult a qualified electrician,
electrical inspector, or local agency having jurisdiction
for local codes or ordinances that apply to the intended
use of generator.
The National Electric Code (NEC) requires the generator
to be connected to an earth ground. Before using the gen-
erator, connect a copper wire (minimum 10 AWG) from the
ground terminal (see Figure 18) to an earth ground. Con-
sult a licensed electrician for proper grounding methods.
FIGURE 18: Ground Terminal
NOTE:
The generator has a floating neutral which means the
ground terminal on the generator is not connected to the
AC neutral wire in the generator. If using a receptacle
tester, it will not show the same ground circuit condition
as for a home receptacle.
Special Requirements
There may be Federal or State Occupational Safety and
Health Administration (OSHA) regulations, local codes, or
ordinances that apply to the intended use of generator.
Please consult a qualified electrician, electrical inspector,
or the local agency having jurisdiction.
In some areas, generators are required to be regis-
tered with local utility companies.
If generator is used at a construction site, there may
be additional regulations which must be observed.
HW7000EH Portable Electrical Generator Owner's Manual
Grounding the Generator

Using Generator for Backup Power

DANGER
Improper connections of the generator to a building's electri-
cal system can be deadly.
Electrical current from generator can feedback into
utility lines. Such feedback may electrocute utility
company workers or others who contact utility lines
during a power outage.
Electrical current can feedback into generator. When
utility power is restored, generator may explode,
burn, or cause fires in building's electrical system.
• Before connecting to a building's electrical system, con-
sult a qualified electrician, electrical inspector, or local
agency having jurisdiction for local codes or ordinances
that apply to the intended use of generator.
www.honeywellgenerators.com
11

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido