Connections; Dust Collection; Electric Connection - Truper SME-10X-3 Manual Del Usuario

Ocultar thumbs Ver también para SME-10X-3:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Dust Collection

• The equipment shall be connected into an external device
to extract chips and dust before starting to work.
• The air speed required is 65,6 ft/s for dry chips and
91,8 ft/s for wet chips (18% humidity).
• The air flow required is 882,8 cfm
• Pressure drop in the dust collecting equipment chute shall
be 0, 1 5 PSI

Electric Connection

• Connections and cabling shall only be carried out by
certified personnel.
• Double check voltage and frequency required in the
equipment (shown in the cabinet nameplate) match the
power supply.
• Make sure you have overload protection device and a
circuit breaker to prevent electrical discharge.
• When the connection is fixed, verify the equipment is duly
grounded and all the cabling is insulated. Check the motor
direction of rotation and replace the cabling if necessary.
Check all components are in good repair and correctly
fixed.
10
ENGLISH

Connections

220 V / 2 Phase (PH) / 2 240 W (3 HP)
2,5 mm
2
eb1
(Black)
KM1
14 AWG X 3
KM1
(2,5 mm
2
x 3)
L1 L2 PE
Dust
Chute
(4"
diameter)
95
KM1
96
2,5 mm
2
95
(Black)
eb1
96
S1
M1
1PH
PE

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido