Installation Checklist - Amana BC21VC Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Checklist

This checklist is for personal records only.
Consumer Installer
Notes
Consumer's Signature
Doors
Handles are solidly attached to doors.
Handle side of door is
loaded with food.)
Doors seal completely to refrigerator cabinet.
Leveling
Refrigerator is tilted
1
/
Toe grille is properly attached to refrigerator.
Ice Maker
Water supply to refrigerator is turned on.
Water leaks are not present at connection between household water supply and
refrigerator. (After 24 hours, consumer should check connection for water leaks.)
Ice maker arm is in on position for ice production. (It may take up to 24 hours for
first harvest of ice.)
Product Literature
Owner's manual is reviewed including the following information.
• product registration card
• Fresh Food and Deepfreeze
• Humidity-controlled crispers
• normal operating sounds
Installer's Signature
1
/
" (3 mm) higher than hinge side. (Door lowers when
8
" (6 mm) from front to rear.
4
©
controls
Installer's Company Name/Phone Number
7
Date

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bc21vlBc21vw

Tabla de contenido