Preparing For Installation - GE JP380 Guía De Uso Y De Cuidado E Instalación

Asador eléctrico
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARING FOR INSTALLATION

For ducting through the floor.
Tie down bolt
on each end
(front and rear).
*Blower can be
Grease
swiveled 90°
Container
"
"
28
7
1
9
3
8
16
8
73.34 . 1 6cm
23.81 cm
"
"
20
15
1
16
16
53.18 cm
.16 cm
(Min.)
"
1
7
8
4.76 cm
(Min.)
*The blower may be rotated for horizontal or vertical direction
by loosening nuts around the blower inlet, accessible inside the
ventilation chamber.
PREPARING FOR INSTALLATION
For ducting through the back wall.
"
9
3
8
23.81 cm
13"
33.02 cm
*The blower may be rotated for horizontal or vertical direction
by loosening nuts around the blower inlet, accessible inside the
ventilation chamber.
14
INSTALLATION INSTRUCTIONS
Grease
Container
"
"
7
9
16
19.21 cm
(continued)
3" (7.62 cm)
"
15
5
8
39.69 cm
Minimum
Clearance
A
IMPORTANT
Dimension "A"—Provide 2" min. (5.08 cm)
cabinet clearance to motor for cooling purposes.
NOTE: Where possible, 6" (15.24 cm) is
recommended for motor/blower service.
Side Clearance—Grills installed near a side
wall should allow a minimum clearance of
6" (15.24 cm) for best venting performance, but
may be safely installed as near as 1" (2.54 cm)
from a side wall if required by space limitations.
Electrical Hookup—The unit should be
properly circuit protected and wired according
to local electrical codes. See electrical wiring
information on back. Unit power requirements
are located on the data plate.
Ducting Requirements—Use of a wall cap
required. See Step 5 "Install the Ductwork."
You must allow room enough to remove and
empty grease containers.
Grease
Container
14"
11
7
8
35.56 cm
30.16 cm
"

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido