suspension Mounting (continued)
4
Attaching the light to chain
□ If using chains to suspend the fixture from the ceiling, attach an S
hook (HH) to the bottom of the mounting chain (GG) and then to the V
clip (DD) near the end of the fixture body (B). Repeat this step on the
other side of the fixture.
□ Hang the fixture body (B) by placing one chain over each hook (not
included) that has been installed on the ceiling.
□ Adjust chains to level light.
noTe: Product should be suspended using metal chain or cable and
hooks with weight bearing capacity exceeding 11 lbs (5 KG).
noTe: If using eye hooks in the ceiling instead, attach the top of the
chain with additional S hooks (HH).
5
Activating the fixture
□ Restore the power supply to turn on the light.
surface Mounting
With power disconnected to the electrical box, remove the existing fixture. Make a sketch of how the current fixture is wired (by wire color
or mark the wires with masking tape and a pencil so you will know how to properly reconnect the wires to the new LED light fixture.
1
Installing the U brackets
□ Hold the U brackets (CC) up to the mounting surface to determine the
mounting position.
noTe: The U brackets (CC) should be positioned 33 1/2 inches
apart.
□ Mark the screw positions for the U brackets (CC) on the mounting
surface.
□ Drill a 1/8 in. pilot hole into the screw locations marked on the ceiling.
You can also use an awl or nail to dimple the screw holes.
□ Install a drywall anchor (BB) in each drilled mounting hole.
□ Insert two mounting screws (AA) through the U bracket (CC) and into
the drywall anchors (BB) installed in the mounting surface.
□ Tighten each mounting screw (AA) to secure the U bracket (CC) to the mounting surface.
□ Repeat the installation for the second U bracket (CC).
CC
8
GG
DD
HH
B
EE
BB
CC
AA