Sterling 6500 Serie Manual Del Usuario página 7

Ocultar thumbs Ver también para 6500 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Without Filler Jamb
Wall Jamb
3. Install the Wall Jambs and Optional Filler Jamb
With a pencil, mark the location of the wall jamb on the shower wall. Measure evenly on both sides.
Place the wall jamb against the wall and check for plumb with a level. The adjustment clamps will
be located closer to the inside of the shower.
Make a pencil mark at each of the four pre-drilled holes in the wall jamb and remove the wall jamb.
Lightly center punch the four hole locations on each wall.
When the installation is on ceramic tile, use the center punch to nick the surface glaze. Tap the
punch lightly with the hammer to avoid cracking the ceramic tile.
Drill each hole with a 3/16" drill bit (use a masonry bit for ceramic tile), and insert anchors in each
hole.
If your installation requires a filler jamb, position the filler jamb over the holes.
Secure a wall jamb in place (over the filler jamb if needed) using four provided panhead screws.
Repeat for the other wall jamb, skipping filler jamb procedures.
Remove the bottom track and thoroughly clean the shower ledge.
Sterling
Drill holes.
Anchor
#8-18 x 2"
Panhead Screw
Top View
Wall Jamb
Filler Jamb
Filler Jamb
7
With Filler Jamb
Wall
Jamb
1034028-2-E

Publicidad

Tabla de contenido
loading

Tabla de contenido