Commissioning; Initial Start-Up - Stiebel Eltron DHB-E 13-2 electronic Instrucciones De Uso Y Montaje

Calentador instantáneo con controlado electrónica
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

Commissioning

10.3.11 Installation for offset tiles
This appliance can be installed where tiles are offset. See diagram
for maximum tile offset and minimum contact area of the appli-
ance. Adjust the wall clearance and lock the back panel with the
fixing toggle by turning it clockwise through 90°.
Installation dimensions for offset tiles
20
www.stiebel-eltron.com
11. Commissioning

11.1 Initial start-up

Danger to life through electrocution!
Commissioning must only be carried out by an author-
ised contractor in accordance with safety regulations.
Commissioning
f Open and close all connected draw-off valves several times.
f
Continue until the line network and the appliance are free
of air.
f Activate the safety pressure limiter. The instantaneous water
f
heater is delivered with the safety pressure limiter triggered.
Activate the safety pressure switch at flow pressure by press-
ing the reset button.
f Push the temperature selector plug into the "set tempera-
f
ture" PCB.
f Fit the appliance cap and secure with a screw.
f
f Switch the mains power ON.
f
f Calibrate the temperature. For this, turn the temperature se-
f
lector fully clockwise then fully anti-clockwise.
f Check the appliance function.
f
f Remove the protective foil from the user interface.
f
DHB-E electronic |
13

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Dhb-e 16-2 electronic

Tabla de contenido