Commissioning; Changing The Connected Load Via The Jumper Slot; Initial Start-Up; Recommissioning - Stiebel Eltron DCE-C 6/8 Trend Operación E Instalación

Calentador instantaneo electronico
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30
iNSTallaTiON

Commissioning

10. Commissioning
10.1 Changing the connected load via the jumper
slot
If you select a connected load other than the factory setting for
the appliance, you will need to reposition the jumper.
f Install the jumper in the required position on the "Pmax" pin
f
strip.
Jumper position
Connected load
DCE-C 6/8 Trend
1
@ 220 V 6.0 kW
@ 230 V 6.6 kW
2
@ 220 V 8.0 kW
@ 230 V 8.7 kW
No jumper
@ 220 V 6.0 kW
@ 230 V 6.6 kW

10.2 Initial start-up

f Tick the selected connected load on the type plate. Use a
f
ballpoint pen to do this.
f Open and close all connected draw-off valves several times,
f
until all air has been purged from the pipework and the
appliance.
f Carry out a tightness check.
f
f Activate the safety switch by firmly pressing the reset button
f
(the appliance is delivered with the safety switch disabled).
8
| DCE-C Trend
1
2
Connected load
DCE-C 10/12 Trend
10.0 kW
11.0 kW
12.0 kW
13.1 kW
10.0 kW
11.0 kW
≥ 60 s
f Hook the appliance cover into the appliance back panel at the
f
top rear. Pivot the appliance cover downwards. Check that
the appliance cover is securely seated both top and bottom.
f Secure the appliance cover with the screw.
f
f Switch on the power supply.
f
10.2.1 Appliance handover
f Explain the appliance function to users and familiarise them
f
with how it works.
f Make the user aware of potential dangers, especially the risk
f
of scalding.
f Hand over the instructions.
f

10.3 Recommissioning

Material losses
!
To ensure that the bare wire heating system is not dam-
aged following an interruption to the water supply, the
appliance must be restarted by taking the following steps.
f Disconnect the appliance from the power supply by
f
removing the fuses/tripping the MCBs.
f Open the tap for at least one minute until the appli-
f
ance and its upstream cold water inlet line are free
of air.
f Switch the power back ON.
f

11. Appliance shutdown

f Isolate all poles of the appliance from the power supply.
f
f Drain the appliance (see chapter "Maintenance / Draining the
f
appliance").
www.stiebel-eltron.com

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dce-c 10/12 trend

Tabla de contenido