INSTaLLaTION
Commissioning
11. Commissioning
11.1 Initial start-up
f Fill the appliance by running the tap several times until the
pipework and appliance are free of air.
f Carry out a tightness check.
f Insert the power cable plug, if present, into the standard
safety socket or set the fuse/MCB.
f Check the appliance function.
f In the case of oversink installation, affix the company logo
supplied over the existing company logo.
11.2 Appliance handover
f Explain the appliance function to users and familiarise them
with how it works.
f Make the user aware of potential dangers, especially the risk
of scalding.
f Hand over these instructions.
www.stiebel-eltron.com
11.3 Recommissioning
Material losses
!
Following an interruption of the water supply, recommis-
sion the appliance by carrying out the following steps,
in order to prevent irreparable damage to the bare wire
heating system.
f Isolate the appliance from the power supply. Pull the power
cable plug, if present, from the socket, or remove the fuse/
reset the MCB.
f See chapter "Initial start-up".
11.4 Settings
You can alter the maximum flow rate and temperature.
DANGER Electrocution
The flow rate and temperature may only be adjusted if
the appliance is isolated from the power supply.
f Isolate all poles of the appliance from the power supply.
DANGER Electrocution
The adjusting screw for changing the flow rate and the
potentiometer for setting the temperature are live if the
appliance has not been isolated from the power supply.