Installation To Solid Concrete - PEERLESS FPECMC-01 Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation to Solid Concrete surface
• Concrete must be 3000 psi density minimum. Lighter density concrete may not hold concrete anchor.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard-
ware and components.
Use ceiling plate (C) as a template to mark six mounting holes on concrete ceiling. Drill six 3/8" (10 mm) dia. pilot
1
holes to a minimum depth of 3". Place concrete expansion anchors (L) into ceiling and tighten to secure. Remove
bolt and washer from anchor housing. Place ceiling plate over anchors and secure with bolt and washer from
anchor housing. Tighten all fasteners.
WARNING
• Tighten screws so that ceiling assembly is fi rmly
attached, but do not overtighten. Overtightening
can damage screws, greatly reducing their holding
power.
• Always attach concrete expansion anchors directly
to load-bearing concrete.
• Never attach concrete expansion anchors to
concrete covered with plaster, drywall, or other
fi nishing material.
WARNING
L
C
WASHER (L)
BOLT (L)
1
Drill 3/8" (10 mm) dia. holes.
2
Tap concrete expansion anchors (L) into holes.
3
Tighten concrete expansion anchors (L) to secure to wall.
4
Unscrew bolt and washer from anchor housing, level wall plate (C)
on wall, and secure. Do not tighten in excess of 80 in•lbs (9.0 N.m.).
4 of 24
CONCRETE
SURFACE
C
ISSUED: 08-09-10 SHEET #: 061-9058-4 10-18-10
concrete
surface
L
L
L

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fpecmc-02Fpecmc-03Fpecmc-04

Tabla de contenido