Defiant DFI-0452-WH Guía De Uso Y Cuidado página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
6
Mounting the solar panel
RECOMMENDED: Caulk around the base and on top of
the screw heads after installation.
Place the solar panel (F) against the mounting surface and
mark the mounting holes.
□ If mounting to a wooden surface, drill three 3/32 in.
holes into the mounting surface. Install the three
mounting screws (AA) through the solar panel
cradle (G) and into the mounting surface.
□ If mounting to wall board or brick, drill three 7/32 in.
holes into the mounting surface. Insert the wall
anchors (BB) and attach the solar panel cradle (G)
using the three mounting screws (AA).
□ Once the solar panel cradle (G) has been installed,
position the solor panel (F) above it, adjusting the
direction and angle of the panel to its desired
position to receive optimal sunlight.
□ Slide the base of the solar panel (F) into the cradle
(G). It will snap and lock in position.
7
Adjusting the solar panel
IMPORTANT: The solar panel (F) must receive as much
direct sunlight over the course of the day as possible. Keep
in mind that shadows may block the sunlight from reaching
the solar panel (F) during the day.
□ Rotate the solar panel (F) to the desired angle.
F
8
AA
BB
Connecting the solar panel
8
to the light fixture
□ Carefully connect the solar panel (F) cable to
the light fixture (B). Screw the caps on the
plugs firmly.
□ Wrap any excess solar panel cable around the
cradle (G) located on the rear of the solar
panel (F). Leave enough loose cable to form a
drip loop.
IMPORTANT: Push the switch to the OFF position
and allow the battery to charge with 2 to 3 days of
full sunshine before testing.
G
F
G
B
F
G

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido