Descargar Imprimir esta página

Facom 954 Guía De Instrucciones página 3

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6
GB
1
Contents
Item Reference Designation
01
950.01
Dial indicator
50
950.50
Short adapter
55
950.55
Long adapter
3
Procedure for Timing the Injection Pump at TDC
Note : Depending on the type of injection pump and the timing specified by the manufacturer, proceed as follows:
Timing the Pump at TDC
Application for pumps with end access to plugs (Bosch, Kiki, Nippon Denso)
3-1
Timing the Injection Pump at TDC (pumps with end access)
• Fit tools as per 2-2. • Tip the pump toward the outside of the engine. • Turn the crankshaft to position the engine at TDC, set the
gap. Starting at the gap setting position (remove the TDC tool) , rotate the crankshaft 90° in the CCW direction (until the dial indicator
indicates bottom dead centre position of the pump) . • Reset the dial indicator to 0 (record the pre-load value) . • Rotate the crankshaft
in the CW direction to position the engine at TDC, set the gap. • Gently tip the pump until the dial indicator displays the timing value
(plus the preload value recorded above) • Tighten the pump attachment bolts • Remove the TDC gap setting tool. • Check.
Checking (3-1)
• Rotate the crankshaft 45° in the CCW direction and then rotate in the CW direction to position the engine at TDC set the gap.
• In this position, the dial indicator should indicate the timing value. • If necessary, repeat the timing procedure.
2
Preparation and assembly
Note : Always refer to the distributor or injection pump supplier manual to determine
the appropriate preparation before attempting to adjust either.
* Any time work is to be performed on the distributor or injection pump, refer to the
vehicle manual.
TDC = Top Dead Centre
Caution : Always disconnect the vehicle battery before beginning.
Qty.
2-1
Dial Indicator 01.
Use the dial indicator with its original stylus (t) to take measurements using adapters
1
50 - 55.
1
2-2
Short 50 and long 55 Adapters.
1
Unscrew the inspection port plug (b) on the end of the pump. Thread in and
finger tighten adapter 50 or 55. Fit the dial indicator 01 plus the original
stylus (t). Pre-load (P) and secure (f).
F

Publicidad

loading

Este manual también es adecuado para:

950.01950.50950.55