Mark the temporary nipple
at the finished wall.
2. Prepare the Site
NOTE: This section continues the installation described in the
steam generator installation instructions. Refer to the steam
generator installation guide for more information, if needed.
NOTE: If two steam heads are used, there must be at least 12-1/2"
(318 mm) between the center of each hole. The steam heads do not
need to be located in the same area.
Install the finished wall.
Mark the temporary pipe nipple at the finished wall surface.
Remove the temporary pipe nipple from the elbow.
Drill or cut a 2-1/2" (64 mm) hole centered around the elbow in
the wall.
1235393-2-A
1/2" NPT
Elbow
Finished
Wall
6
2-1/2"
(64 mm)
Kohler Co.